Project engineering tender project. Based on twin 55.000 m3/d installations for refrigeration towers and human consumption
Desalination plant 2 x 55.000 m3/d
UAE
Year
2008
Summary
Category
Seawater
Use
Human Consumption
Scope
Process engineering
Capacity
55.000 m3/d
Intake
Horizontal drains
Discharge
Submarine discharge with diffusers
Pre-Treatment
Ultrafiltration
Cartridge filters security filtration
First and second pass antiscalant dosage
Sodium hypochlorite/bisulphite dosage
Second pass sodium hydroxide dosage
Cartridge filters security filtration
First and second pass antiscalant dosage
Sodium hypochlorite/bisulphite dosage
Second pass sodium hydroxide dosage
RO Process
Five 11.100 m3/d trains with partial second pass, one train in standby
Energy Recovery
Isobaric exchanger
Post-Treatment
In-line CO2 dosage
Lime milk dosage
Sodium hypochlorite dosage
Lime milk dosage
Sodium hypochlorite dosage
Storage
Four 6.750 m3 tanks
Auxiliary systems
Reverse osmosis flushing and chemical cleaning system
Ultrafiltration cleaning system
Filter cleaning system
Ultrafiltration cleaning system
Filter cleaning system