Desalination plant 20.000 m3/d

Spain

Year
2010
Summary

Expansion suitability project of existing facilities without operation shutdown

Category
Brackish Water
Use
Human Consumption
Scope
Process engineering
Capacity
20.000 m3/d
Intake
Expansion and adaptation of existing seawater intake
Discharge
Connection to existing discharge system
Pre-Treatment
Cartridge filters security filtration
Sodium hydroxide dosage
Sulphuric acid dosage
Antiscalant dosage
RO Process
Four 5.000 m3/d capacity trains
Energy Recovery
Isobaric exchanger
Post-Treatment
CO2 dosage
Constant height calcite layers
Sodium hydroxide dosage
Automation and control
Installation of existing and expansion control room
Auxiliary systems
Reverse osmosis flushing and chemical cleaning system
Unification of existing infrastructures for brine, osmotized, remineralized water driving with raw water pumping and CO2 injection
Neutralization equipment
Firefighting systems
Drain network
Water service network
Copyright © 2024 IASUR